Job story

Suprabakti recently completed the belt installation and splicing of steel cord belt at Freeport Lower Wanagon waste handling project. The work conssist of installation and splicing of BC233 (363mtr), BC232 (607mtr), BC202 (133mtr). The belt width is 84”, ST-1800 and ST-3150 supplied by Veyance Technolgies (Goodyear). All belts come with Goodyear 2000 Sensor Guard to protect belt from longitudinal rip. The splice using Veyance patented “pre-formed splice” materials.

The Supra Heavy Duty belt winder/winch is used as part of the belt installation work. The belt winder is used for pulling and also releasing belt at slope belt.

Shaw-Almex vulcanizer is used for vulcanizing all the belts.

The Lower Wanagon site is located at approx. 4,200 mtr above sea level with average temperature of 10 deg at day time. The unpredictable weather condition at this site make the works even more challenging.

Freeport Indonesia located in remote highlands in the province of Papua, Indonesia, processes and explores ore containing copper, gold and silver. The Grasberg mining complex is one of the world’s largest single producers of both copper and gold, and contains the largest recoverable reserves of copper and the largest single gold reserve in the world.

 


rema_tip_top
almex_logo
flexco_logo
martin_engineering_logo
goodyear_logo
voith_logo
tru_trac_logo
etec_logo
loctite_logo
precismeca_logo
ringfeder_logo
badlor_logo